Scope of Work
- 87,200 sf - Slab on Grade & Spread Footing Foundation
- Continuous Dock Pit
- (1) Truckwell
- Casting Beds for Tilt Wall Panels
- 11,750 sf - Concrete Tilt Wall Panels - Panel Shop Drawings w/Casting Layout
- Concrete Pumping
- Light Pole Bases
- 5,900 sf - Sidewalks
- Dumpster Pad & Truck Scale Foundation
- 660,200 sf - Concrete Paving
- Concrete Paving Sub grade Prep - Lime Treated
- Building Pad Excavation & Fill
- Initial Site Clear & Grub, Site Balance & Rough Grading
- Detention Pond Excavation
- Parking Lot Striping Package
- Erosion Control
Using Ductilcrete we eliminated an estimated 75% of joints than conventional concrete and no steel reinforcing. As a licensed installer, we used Ductilcrete's patented formula in a 2-step placement system to create ultra-flat, long-lasting slabs. Learn more about Ductilcrete's evolutionary system here.